Exploring a semiconductor city?

Jobs, housing and what it really costs in 11 US towns with semiconductor fabs, from dated public sources.

Explore the map

Switch the map between fab status, home price and number of fabs.

Browse by topic

Pick a question and see the answer for every town.

All topics ›

Browse by town

Fab status, typical home price and a set of guides for each town. Prices are town-level estimates from several public sources.

Fab statusBuilding
Typical home price$262K to $375K
Guides14 guides
Fab statusOperating + building
Typical home price$506K to $522K
Guides13 guides
Fab statusOperating + building
Typical home price$328K to $329K
Guides13 guides
Fab statusBuilding
Typical home price$436K to $637K
Guides13 guides
Fab statusOperating + building
Typical home price$481K to $630K
Guides13 guides
Fab statusOperating
Typical home price$440K to $509K
Guides10 guides
Hillsboro, ORIntel
Fab statusOperating
Typical home price$518K to $564K
Guides10 guides
Rio Rancho, NMIntel
Fab statusOperating
Typical home price$364K to $389K
Guides10 guides
Fab statusOperating + building
Typical home price$225K to $276K
Guides11 guides
Fab statusOperating + building
Typical home price$590K to $655K
Guides10 guides
Manassas, VAMicron
Fab statusOperating
Typical home price$547K to $562K
Guides10 guides

All towns, side by side ›

Compare towns

Pick two to four towns and see them side by side.

Boise, IDPhoenix & Chandler, AZSyracuse & Clay, NY
Fab statusOperating + buildingOperating + buildingBuilding
Home price range$481K to $630K$506K to $522K$262K to $375K
RentBoise 1-bed about $1,300, 2-bed about $1,500 (Zumper, Jun 2026)Chandler 1-bed about $1,460, 2-bed about $1,800 (PadMapper, Sep 2026)$1,320 to $1,900
Property or income taxAbout 0.5% to 0.8% effectiveAbout 0.44% to 1.3% effectiveAbout 2.3% to 2.6% effective
WeatherAbout 6 days a year at 100°F or more; 12 to 22 in. of snow122 days at 100°F or more in 2025About 128 in. of snow a year

Open the full comparison ›

What can my pay buy?

Enter a salary and see which towns’ home prices fit, using the common rule of thumb of 28% of gross pay for housing.

$2,800a month for housing at 28% of gross pay
Sherman, TXUp to $430K
Fits
Fits
Fits
Rio Rancho, NMUp to $479K
Fits
Columbus, OHUp to $433K
Out of reach
Malta, NYUp to $447K
Partly fits
Boise, IDUp to $500K
Partly fits
Out of reach
Hillsboro, ORUp to $485K
Out of reach
Manassas, VAUp to $482K
Out of reach
Lehi, UTUp to $516K
Out of reach

The band is the town’s home price range. The dark line is the most your pay supports.

This is arithmetic, not advice. It counts the mortgage and property tax only, with the middle of each town’s tax range. The rate is our assumption, not a quote. Open the full calculator ›

What a home costs near each fab

Each bar spans the lowest to highest town-level estimate in our sources. Tap a bar for the housing guide.

Blue: fab running. Orange: still being built. Grey: planned.

Fab jobs by company and place

The fabs people search for, with status, jobs and housing on one page.

Tools