Fab towns / Syracuse & Clay / Snow and winter living

Snow and winter living

Syracuse is one of the snowiest big cities in the US. Here are the numbers.

128 inSnow in a normal year
60.8 inLast winter, below normal

Inches of snow in Syracuse

Normal (NOAA 1991 to 2020)
128 in
2019 to 20
87.6 in
2020 to 21
73.3 in
2021 to 22
76 in
2022 to 23
65.6 in
2023 to 24
60.8 in

The last five winters come from a weather account on X. Check NOAA for the official table.

How much snow
  • NOAA’s 1991–2020 normal at Hancock Airport is about 128 inches a year (127.8). One local weather site lists 123.8, which we could not reconcile.
  • A weather account on X lists the last five winters as 87.6, 73.3, 76.0, 65.6 and 60.8 inches, all below normal. It is a social post, so check NOAA’s own table.
What it means

Lake-effect snow comes in bands, so a town ten miles north can get a very different winter. Heating is a real line in the budget, covered on the Taxes and utilities page.

Winter driving, snow tires and garage versus street parking are not researched here yet.
Sources (3)