Weather and seasons near Sherman
North Texas summers run hot, with July highs near 93°F to 95°F and almost no snow.
93°F to 95°FJuly average high, by source
~2 inSnow a year
Inches of snow a year, compared
Syracuse
128 in (NOAA)
Albany, for Malta
59 in (NWS)
Salt Lake City, for Lehi
about 56 (47 to 63)
Columbus
about 28 (22 to 28)
Boise
about 19 (12 to 22)
Manassas
about 17 (11.5 to 22)
Albuquerque, for Rio Rancho
about 10 (8 to 11)
Portland, for Hillsboro
3.6 to 4
Denison, for Sherman
about 2
Normals from different sources and stations, so treat each as a range. Phoenix and Austin were not measured here.
Heat and rain
- July’s average high is about 92.8°F to 95°F depending on source. July rainfall is about 2 to 2.3 inches.
- Annual precipitation clusters between 41 and 44 inches.
- Snow is minimal, about 2 inches a year.
Not covered: days over 100°F and tornado season. Our sources said nothing on either, and these are Denison figures. Check NWS Fort Worth.