Fab towns / Malta, NY / Taxes

Taxes near Malta

Saratoga County’s effective property tax rate is about 1.4% to 1.5%.

1.4% to 1.5%Effective rate, most sources
$1.77County rate per $1,000, 2026

Property tax

  • Most sources put the effective rate at about 1.40% to 1.50%. The full spread is 1.27% to 1.53%.
  • The county’s own rate is $1.77 per $1,000 of assessed value in 2026, down from $1.87. Town and school taxes are extra.
  • One source shows a median bill near $4,875 on a $348,600 home, a lower-priced home than most of those near Malta.
Not covered: New York State income tax brackets (only the 10.9% top rate was confirmed), and school tax for a specific address.