Fab towns / Malta, NY / Healthcare

Healthcare near Malta

Malta has a 24/7 emergent care site. Trauma levels for the larger hospitals were not confirmed.

24/7Malta Med Emergent Care
~8 miSaratoga Hospital
Hospitals
  • Malta Med Emergent Care, 6 Medical Park Dr.: open 24/7, with a helipad and ambulance bay. It is a joint project of Saratoga Hospital and Albany Medical Center.
  • Saratoga Hospital is about 7.8 miles from the Malta medical park.
  • Ellis Hospital in Schenectady is about 12 miles away. A 2022 resident post says its ER changed hours. That is anecdotal and dated, so check current status.
  • Albany Medical Center and St. Peter’s Hospital, both in Albany, are about 22 miles away.
How to read this

Trauma levels run from I (highest) to IV or V. A hospital without a trauma level can still have a 24-hour emergency room.

Not covered: trauma designations for Saratoga, Albany Med, Ellis and St. Peter’s. Check the New York State Department of Health.
Sources (2)