Weather and seasons near New Albany
Columbus gets modest snow, about 28 inches a year, and warm, not extreme, summers.
~28 inSnow a year, secondary sources
85°F to 86°FNormal July high
Inches of snow a year, compared
Syracuse
128 in (NOAA)
Albany, for Malta
59 in (NWS)
Salt Lake City, for Lehi
about 56 (47 to 63)
Columbus
about 28 (22 to 28)
Boise
about 19 (12 to 22)
Manassas
about 17 (11.5 to 22)
Albuquerque, for Rio Rancho
about 10 (8 to 11)
Portland, for Hillsboro
3.6 to 4
Denison, for Sherman
about 2
Normals from different sources and stations, so treat each as a range. Phoenix and Austin were not measured here.
Winter
- Annual snowfall is about 22 to 28 inches by source. The 28-inch figures are closest to the 1991 to 2020 normals, but we could not confirm what NOAA publishes.
- January is the snowiest month, about 7.9 inches. The normal January low is about 21°F to 23°F and the high about 36°F to 37°F.
Summer
- The normal July high is about 85°F to 86°F, with a low near 65°F.
Not covered: rainfall, storms and the official NOAA table for John Glenn International Airport.