Fab towns / Lehi, UT / Weather and seasons

Weather and seasons near Lehi

Lehi has a snowy winter and a hot summer. Lehi itself was not measured, so these are Salt Lake City figures.

47 to 63 inSnow a year, Salt Lake City
Nov to AprSnow season

Inches of snow a year, compared

Syracuse
128 in (NOAA)
Albany, for Malta
59 in (NWS)
Salt Lake City, for Lehi
about 56 (47 to 63)
Columbus
about 28 (22 to 28)
Boise
about 19 (12 to 22)
Manassas
about 17 (11.5 to 22)
Albuquerque, for Rio Rancho
about 10 (8 to 11)
Portland, for Hillsboro
3.6 to 4
Denison, for Sherman
about 2

Normals from different sources and stations, so treat each as a range. Phoenix and Austin were not measured here.

Winter
  • Salt Lake City snowfall runs about 47 to 63 inches a year, around 56 on average. Snow typically starts in November, ends in April and is gone from June to September.
  • Winter temperature inversions can trap cool air and pollutants in the valley and bring fog and haze. We found no air-quality data for Utah County or Lehi.
Temperatures
  • One weather site gives a January average low of 24°F and a July high of 94°F. We could not check those against the official normals.
Not covered: Lehi itself and the official NOAA normals for Utah County.
Sources (3)