The Dalles, Oregon

Google The Dalles

Operating checked 1 Nov 2026

154 MWpower online now
154 MWpeak planned or projected
$5.8Bestimated capital cost, built so far
OROregon

Facts

Owner
Google
Chips
TPU v6e, TPU v5p, TPU v5e, TPU v7

Timeline

2023-05-21

First signs of construction.

2025-03-07

Building 1 is estimated to be operational, based on all external equipment being installed.

93 MW
2026-04-29

Building 2 is estimated to be operational, based on all external equipment being installed, and ordinary cars parked by the building.

185 MW

Past entries are observations; entries marked projected are estimates and can change.

Data: Epoch AI, AI data centers dataset, licensed CC BY 4.0. We selected fields, cleaned location names, and added the status label.